Edmi meter codes. APPROVED BY ISSUE DATE PAGE R0000554739 V2.

Edmi meter codes Standards and Compliance Class 1 and Class 2 IEC 62052-11, 62052-21, Built on the advanced metering platform, the Mk7A is a single phase 2-element meter which integrates both a 100A UC3 compliant relay and 40A UC2 compliant load control relay which allows disconnection and reconnection of electrical services remotely. We look forward to seeing your problems in the Input the following short codes on the UIU and press enter: My meter has been activated and I want to load/recharge my meter? Step 1: Ensure your UIU has been successfully paired with To check your prepaid meter balance using a code, follow the simple steps below: After inputting the code, click on the ‘’Enter’’ button. Communications. It is a single phase import/export meter. Mk10D Three Phase Smart Meter with Disconnect Feature ATLAS – Class 1 and Class 2 Built on the advanced Atlas metering platform, the Mk10D adds three 100A UC3 compliant relays into the meter which allows for disconnection and reconnection of electrical services remotely. com Supported Meter Types • Mk32 • Mk7MDC • Mk10M* Communications • Radio Frequency Open air communication distance Now I can also tell you in the 3 years that I have had this meter it has been remotely configured at least 4 times since its installation. Achieved a milestone of 2 million of EDMI’s smart meter connections to Storm, EDMI’s Head End Systems in ANZ. I don’t have solar yet and want to understand if there is a way to know peak, off peak, shoulder Below are the six simple steps to recharge your meter and the codes you need to input. 8kg EDMI Limited (Headquarters) 47 Yishun Industrial Park A, Singapore 768724 Tel: +65 6756 2938 Fax: +65 6756 0125 Email: marketing@edmi-meters. R. The Mk6ES combines high precision metering and comprehensive data for network operation for power quality and substation monitoring. Created Date: Smart Energy Code as being relevant to the GBCS. Figure 2-1 Overall Dimensions of the Meter. It is a unique product which enables energy usage to be continually measured and SSC Code Indicates the start of the MPAN number which scrolls across the display 3. 2 EDMI EDMI address changed to Newcastle office in product labelling/ artwork WP20 Smart Water Meter ATLAS — Class 1 and Class 2 Built on the advanced Atlas metering platform, the Mk7C is a single meter with an integrated 100A UC3 compliant relay which allows disconnection and reconnection of electrical services remotely. 5, ATEX Zone 2 Class 1. 91: 91: Meter number: From the table above, you can see that the code for checking meter balance for a single-phase Edmi meter is different from that for a three-phase meter. Three Phase CT/WC Smart Meter. The Edmi prepaid meter codes for checking current credit balance for the single-phase and three-phase meter type is ''10'' and ''01'' respectively. The EDMI Mk 7C meter is a new development of ‘Smart’ metering used to measure Electricity consumption. CSP Communications Services Provider – Responsible for the communication of the UK’s smart metering data To ensure the longevity of ES10A meters supplied by EDMI we ask for some steps to be followed when handling meters. WC Range: 5/100A, 10/100A We use cookies to analyse site traffic and provide you with a better browsing experience. Will not ship until . com 47 Yishun Industrial Park A, Singapore 768724 Prepayment Metering Solution in Tanzania Project Background Utility in Tanzania faces the constant challenge of unpaid bills, electricity theft and accuracy in meter readings. WC Range: 5/100A, 10/100A Specifications with *symbol available in manufacturing codes with prefix 7Ax3 233mm (H ) 128mm (W) 85mm (D) Weight: 1. External Features. Refer to the terminal cover or order code for details. 2020. ; Press and hold the middle button to Figure 3-4 EziView System Code confirmation. The technician rang and had on speaker, acumen technical EDMI Code of Professional Conduct and Business Ethics Policy iv. EDMI address printed on the front face. APPROVED BY ISSUE DATE PAGE R0000554739 V2. which scrolls across the display 3. and others). EDMI Mk6E Meter . Radio Frequency – Open air communication distance <100m – Frequency Bands: 433MHz – Transmit Power: 20 dBm; Voltage & Power Supply Type – 3V DC(2xAAA non-rechargeable batteries) or 5V DC (Micro USB connector) Dimension and Weight. which enables energy usage to be continually measured and SSC Code Indicates the start of the MPAN number. There are clients apps to show how to use the library (GUI: WPF client Please that mini meter won’t stop writing failed when i input my meter number to load my token, i feel my meter hasn’t been activated. Or in a standard form non-metallic meter box, or exposed non-metallic backboard in an Right now, EDMI has millions of meters, communications and software that makes it all happen, working in real-world deployments in the field. If you are told of a possible violation of the Code, you have a duty to report it. DCC Data Communications Company – Government licenced company in charge of the smart metering infrastructure GBCS Great Britain Companion Specification – Technical specification document, an compliment to SMETS The EDMI ES-10B electricity meter and Communications Hub (if fitted) are intended for use in CAT EDMI LIMITED www. Meter Type Compatibility – Abacus: Mk32, Mk32H/Mk7M – Atlas: Mk10D, Mk10E – Mk10M; Mk6E High Accuracy Three Phase Smart Meter GENIUS – Class 0. Specifications with * symbol available in manufacturing codes with prefix 7Cx3 163. com techsupport@edmi-meters. Table 2-1 ATLAS – Class 1 and Class 2. We pledge to balance every business priority with social, economic and environmental responsibilities, working with our employees Mk10E Three Phase CT/WC Smart Meter ATLAS – Class 0. EDMI offers adaptable and flexible solutions that are Mk10A Three Phase CT/WC Smart Meter ATLAS – Class 1 and Class 2 The Mk10A is another addition to the Atlas series which enhances the Mk10 meter with additional communications capabilities for use in Power Quality indication, advanced commissioning functionalities and larger memory storage. com 262mm (H) 175mm (W) 95mm (D) Weight: 2. EDMI ATLAS Mk7A reading acronyms. Three Phase CT/WC Smart Meter EDMI Limited (Headquarters) 47 Yishun Industrial Park A, Singapore 768724 Tel: +65 6756 2938 Fax: +65 6756 0125 Email: marketing@edmi-meters. The BOSFET drivers are rated up to 110V. Mk7A meter. Introduced Genius Series Mk6 with accuracy class 0. DCC Data Communications Company – Government licenced company in charge of the smart metering infrastructure GBCS Great Britain Companion Specification – Technical specification document, an compliment to SMETS The EDMI ES-12B electricity meter and Communications Hub (if fitted) are intended for use in CAT Mk6E High Accuracy Three Phase Smart Meter GENIUS – Class 0. The Mk10D Three Phase Smart Meter with Disconnect Feature ATLAS – Class 1 and Class 2 Built on the advanced Atlas metering platform, the Mk10D adds three 100A UC3 compliant relays into the meter which allows for disconnection and Mk7A Single Phase Smart Meter with Two-Element Feature ATLAS — Class 1 and Class 2 Built on the advanced Atlas metering platform, the Mk7A is a single phase 2-element meter which integrates both a 100A UC3 compliant relay and www. Description: • Single phase dual element electricity meter • Automatic billing reset on the first day of the month. Created Date: There are a few meter codes that seem to be crosschecks of other readings. When this occurs the meters are all reset back to zero. 2 The product SKU is a 10-character code label printed on top left side front face of the Communications Hub. Product Available In: Africa & Middle East Asia Australasia Europe Download WX800 Factsheet Contact Us. 16. SGX-listed SMB United acquired a 30% stake through wholly owned subsidiary Bridex. com Specifications with * symbol available in manufacturing codes with prefix 1Dx3 ATLAS - Class 1 and Class 2 The table below summarizes Edmi prepaid meter codes. Energy. EDMI Dual Band Standard 420 Communications Hub Variant (CS-20) Only qualified Smart Meter Installers should install / remove this equipment. Finally, your prepaid meter balance will be How to Load Token on EDMI Meter. Archive View Return to standard view. Cookie settings Accept cookies Accept cookies Specifications with * symbol available in manufacturing codes with prefix 7Cx3 163. Created Date: Meter Codes to check if you have successfully upgraded #PrepaidMeterUpgrade #LetsGetRolling The EDMI Mk10 meter is a new development of ‘Smart’ metering used to measure Electricity consumption. CSP Communications Services Provider – Responsible for the communication of the UK’s smart metering data The EDMI ES-10A electricity meter and Communications Hub (if fitted) are intended for use in CAT III 300V / 4000VAC impulse rated installations. This meter is 3 single phase meters in one body and replaces your gross meter/s and controlled load meter/s. So, Mk10D Three Phase Smart Meter with Disconnect Feature ATLAS – Class 1 and Class 2 Built on the advanced Atlas metering platform, the Mk10D adds three 100A UC3 compliant relays into the meter which allows for disconnection and Built on the advanced metering platform, the Mk7A is a single phase 2-element meter which integrates both a 100A UC3 compliant relay and 40A UC2 compliant load control relay which allows disconnection and reconnection of electrical Key Specifications Voltage. SOLUTIONS. EDMI Mk7A - Single Phase Smart Meter with Two-Element Feature SKU: 7A13-A344-29-J211-7D02-6110. After the configuration, you can then use your smart card to recharge your EDMI GS-60B is a SMETS compliant, battery powered, ultrasonic gas meter with smart functionality and wireless communications. HD21. We pledge to balance every business priority with social, economic and environmental responsibilities, working with our employees and encouraging our other stakeholders to be in harmony with the society and the environment at large in their day-to-day And at EDMI, this collaboration and communication is key to our continued focus on good corporate citizenship. How to Load Token on EDMI Meter. ) For your electricity Elster SMETS1 meter; Press the middle button to access the main menu. WC range: – With disconnect relay: 5/100A, 10/100A Mk7C Single Phase Smart Meter with Disconnect and Reconnect Feature ATLAS – Class 1 and Class 2 Built on the advanced Atlas metering platform, the Mk7C is a single meter with an integrated 100A UC3 compliant relay which allows www. It is a unique product . Residential. Simply press 07 on your prepaid keypad and hit the blue button. The Mk10D Three Phase Smart Meter with Disconnect Feature ATLAS – Class 1 and Class 2 Built on the advanced Atlas metering platform, the Mk10D adds three 100A UC3 compliant relays into the meter which allows for disconnection and reconnection of electrical services remotely. Customer Interface Unit. Your remote will then connect to the main unit. 07 - Total energy consumed by customer's hot water. Skip to content There are different codes that you can use to operate your Edmi prepaid meter, such as ‘’10’’ & ‘’01’’, and ‘’91’’ for checking credit balance and meter number, respectively. com Weight: 76g (without battery) EDMI Limited (Headquarters) 47 Yishun Industrial Park A, Singapore 768724 Tel: +65 6756 2938 Fax: +65 6756 0125 Email: marketing@edmi-meters. In this Code, EDMI Limited is referred to as “Company” or “EDMI” and Developed Mk3, EDMI's first meter to fully comply with International IEC standards. 1kg EDMI Limited (Headquarters) 47 Yishun Industrial Park A, Singapore 768724 Tel: +65 6756 2938 Fax: +65 6756 0125 Email: marketing@edmi-meters. 5kg EDMI Limited (Headquarters) 47 Yishun Industrial Park A, Singapore 768724 Tel: +65 6756 2938 Fax: +65 6756 0125 Email: marketing@edmi-meters. EDMI’s experience, our proven track record, and millions of EDMI multi-functional smart meters installed worldwide, mean that our products are tried and tested and that you can trust EDMI [] Specifications with * symbol available in manufacturing codes with prefix 7Cx3 163. Flexible communication options are possible with modular pods www. WC Range: 5/100A, 10/100A EDMI, a Global Energy Solution Leader, has successfully delivered over 9 million SMETS2 devices as part of the ongoing residential smart meter rollout in Great Britain. All outputs are fully isolated from each oth er (2kV). Go to any dealer outlets or disco offices close to you with your smart card. Meter Asset Manager’s Code of Practice (MAMCoP) – Gas) and the Smart Metering Installation Code of Practice, as Single Phase Smart Meter with Disconnect and Reconnect Feature ATLAS – Class 1 and Class 2 Built on the advanced Atlas metering platform, the Mk7C is a single phase meter with an integrated 100A UC3 compliant relay which allows disconnection and reconnection of electrical services remotely. 17 Minimise Environmental Impact Energy Consumption Emission Reduction Fugitive Refrigerants sustainability@edmi-meters. Subsection 1. 4. EDMI is one of the leading smart energy solutions providers in the world. EDMI offers a comprehensive range of smart metering devices and associated systems that enable our customers to manage their distribution, load consumption and meter data resources more efficiently. 2. com Specifications with * symbol available in manufacturing codes with prefix 1Dx3 ATLAS - Class 1 and Class 2 Mk7C Single Phase Smart Meter with Disconnect and Reconnect Feature ATLAS – Class 1 and Class 2 Built on the advanced Atlas metering platform, the Mk7C is a single meter with an integrated 100A UC3 compliant relay which allows disconnection and reconnection of electrical services remotely. In 2009, an AMI project was initiated to reduce non-technical losses targeted for the commercial and EDMI offers a range of smart metering solutions. 47 Yishun Industrial Park A Singapore 768724 Code of Professional Conduct and Business Policy Anti-bribery and Corruption Environmental Responsbility . 121mm (H) x 18mm (W) x 61mm (D) Table 1. This milestone includes 5 million Communications Hubs and 4 million smart electricity and gas meters. nz EDMI Pty Ltd Level 7, 51 Alfred Street, Mk7C Single Phase Smart Meter with Disconnect and Reconnect Feature ATLAS – Class 1 and Class 2 Built on the advanced Atlas metering platform, the Mk7C is a single meter with an integrated 100A UC3 compliant relay which allows disconnection and reconnection of electrical services remotely. EDMI, a global leader in the provision of smart metering solutions, has partnered with IoTerop, a leading IoT device management software company, to offer Lightweight Machine to Machine (LwM2M) and Narrowband IoT (NB-IoT) capabilities in its newly released DN20 ultrasonic water meters. ” protocol is a generic protocol to all EDMI meters. Be alert to any violations of the Code, and encourage your team members to speak up if they know or suspect a violation; v. The rest of the library has developed using C# & . Built on the advanced Atlas metering platform, the Mk7A is a single phase 2-element meter which integrates both a 100A UC3 compliant relay and 40A UC2 compliant load control relay which allows your gross meter/s and will be remotely switched to net metering on 1 January 2017 to send energy from your solar system to your household first, before sending the excess back to the grid. With some CD keys EziView will ask for a system code confirmation. Mk10D. The two meters must have the same meter number. What do the codes 07, 03, 13, 43, 53, 63 represent on a Atlas MK7A meter ? Menu Neighbourhood; AGL; Help & Support Sign in. com Specifications with * symbol available in manufacturing codes with prefix 1Dx3 ATLAS - Class 1 and Class 2 Supported Meter Types: Mk32; Mk7MDC; Mk10M* *Under development. While EDMI meter brands have different codes for similar functions,. 4GHz and GBCS compliant, this ultrasonic meter is highly accurate and tamper proof and can work in credit or prepayment mode. 1 EDMI Correction to Receiver category 2 compliance in line with RN Test report 30/01/2019 1. Special I/O Variant. Had a technician do a meter check as our bill was excessive which should not have been the case. Offerings. 7 EDMI Amend environmental specifications 16/03/2020 1. 1; AS 3565; Metering Field Manual DOCUMENT/VERSION NO. S/N: Edmi prepaid meter codes (Single-Phase) Edmi prepaid meter codes (Three -hases) Function: 1. EDMI, a Global Energy Solution Leader, has successfully delivered over 9 million SMETS2 devices as part of the ongoing residential smart meter rollout in Great Britain. Gas flow rate is calculated using a single bounce, Regulations 1998) and the relevant codes of practice (e. Product Features: EDMI Limited www. Your account will be credited by the agent and you • Figure 5-19 An ETM9300 modem fitted to the meter 5-18 EDMI Atlas Hardware Reference Manual Page 83 5-19 Fitting a Modem The SAM2 GSM/GPRS modem from InterCEL is also supported, as shown in Figure 5-20. This is the protocol to be used for mapping a site (discussed later). 13 - Excess energy exported by solar system I had EDMI Atlas Mk7A meter installed yesterday morning for solar no batteries the guy who fitted the meter said 13 was how much solar was being export to the grid EDMI Uses IoTerop’s IOWA SDK to Build a 20+ year NB-IoT Water Meter. 11/01/2019 1. INtL = net solar kW you export. Created Date: Specifications with * symbol available in manufacturing codes with prefix 7Cx3 163. 12. 11, 62052. This means that they are suitable for use in all Build a future with EDMI. Display shows codes 3, 4, 13 & 14. Designed for residential use, WP32 smart meter is the latest offering for water utilities to complement EDMI’s electricity and gas metering product lines. List of PHCN Prepaid Meter EDMI Standard 420 ITCH (CS-12) User Guide Author: EDMI Date: 16/03/2020 Version / Status: 1. Backordered. If you are using HEXING meters, press 801 to check your meter balance. Customer Interface Unit EDMI Limited has adopted this Code of Professional Conduct and Business Ethics Policy (“Code” or “Policy”) which applies to all of the Company’s employees when dealing with its business partners, and our customers, both internally and externally. We pledge to balance every business priority with social, economic and environmental responsibilities, working with our employees and encouraging our other stakeholders to be in harmony with the society and the environment at large in their day-to-day Smart Energy Code as being relevant to the GBCS. Standards and Compliance Class 1 and Class 2 IEC 62052-11, 62052-21, 62053-21, *62052-31, 62053-23 AS 62052. ; Head to ‘Enter UTRN’ and press the middle button. Not all features Smart Energy Code as being relevant to the GBCS. com Specifications with * symbol available in manufacturing codes with prefix 1Dx3 ATLAS - Class 1 and Class 2 Specifications with *symbol available in manufacturing codes with prefix 7Ax3 233mm (H ) 128mm (W) 85mm (D) Weight: 1. Please select the sections below for more information on our Product Ranges and Solutions. China Specifications with * symbol available in manufacturing codes with prefix 7Cx3 163. 1; AS 3565; EDMI Limited has adopted this Code of Professional Conduct and Business Ethics Policy (“Code” or “Policy”) which applies to all of the Company’s employees when dealing with its business partners, and our customers, both internally and externally. 15. 5 compliance added. And at EDMI, this collaboration and communication is key to our continued focus on good corporate citizenship. SOLUTION TO EDMI HD21 8888888 CONNECT ISSUE: Press 755204 then the enter key. Unit price / per +GST Product not in stock. 21 EDMI introduces a new generation of customer interface unit, the HD18, following the success of HD16 and HD14. 121mm (H) x 18mm (W) x 61mm (D) Key Specifications Voltage. 8 Approval Name Position Signature Date Rajan Bhandari Technical Director Email . 11. EziView Basics 3-3 . Standards and Compliance Class 1 and Class 2 IEC 62052-11, 62052-21, Key Specifications Voltage. From the table above, we can see that Mojec, Longi, Conlog, and Hexcel meter brands have the same code for checking credit balances for both single-phase and three-phase meter types. Found what codes 3 & 13 are - LCD Description 01 Standard Current Date and Time 03 Excess energy consumed by customer 13 Excess energy exported by customer What are codes 4 & 14? 4 has b Floor 2, Building 2 Zhong Yuntai Industrial Park Tang Tou 1st Road, Shi Yan Bao An, Shenzhen GuangDong 518108, P. I have been in discussions with my service provider as how to read the EDMI Atlas 10mkD meter. Nominal Voltage: 220V – 240V; Operating Range: 110-130V, 176V – 276V; Frequency: 45Hz – 65Hz; Current. It comes with 10+ years battery life, remote shut-off valve functionality and also integrates with the temperature sensor for volume conversion for high precision performance. It is able to Key Specifications Voltage. WX800 Series. 5S measurement engine with many enhancements including smart grid solutions, high data storage, data processing, UPS configuration and enhanced communications capabilities. Recently got solar (QLD) and had an Atlas Mk7C digital meter installed. The Code of Professional Conduct and Business Policy Anti-bribery and Corruption Environmental Responsbility . g. Smart Energy Code as being relevant to the GBCS. This so frustrating, please look into this 10days of no light is not funny at all Software Application for Meter Configuration EDMI Limited www. For more than four decades, international experts have relied on EDMI flexibility and reliability. • LED1: 1 pulse = 1 watt hour export on Prepaid meter codes for recharging and checking balance. Under the Terminal Cover. WC Range: 5/100A, 10/100A We would love to hear from you. 11, GS-60B Residential Gas Meter SMETS2 Compliant Class 1. The delivery marks a significant step in the transformation of the energy landscape, enabling Smart Water Meter. 3 SET B - SUPPLEMENTRY INFORMATION - Shown when “display” button is held for 2 seconds. The indicated code needs to be sent to EDMI or . Standards and Compliance Class 1 and Class 2 IEC 62052-11, 62052-21, 62053-21, *62052-31, 62053 EDMI Statement about Receiver category 1. 5 Designed for the residential smart meter rollout in Great Britain, the GS60B is the second generation of our SMETS2 compliant gas meters. Designed for grid edge, transmission and distribution metering it provides unprecedented state These codes correspond with the following descriptions: 03 - Excess energy consumed by customer. Nominal Voltage: 220V – 240V; Operating Range: 176V – 276V; Frequency: 45Hz – 65Hz; Current. Rainmaster irrigation system - first commercial computer controlled golf course irrigation system in the world. Nominal Voltage: 100 V – 110V, 220V – 240V; Operating Range: 80V – 278V Frequency: 45Hz – 65Hz; Current. Code of Professional Conduct and Business Policy Anti-bribery and Corruption Environmental Responsbility . com Architectural Illustration Support Open Standards Meter Diagnostics Firmware Upgrade Meter Setup Control Management Mk7Mi Class 1 Single Phase Smart Meter Designed for residential use, the Mk7Mi is a single phase meter with integrated 100A UC3 compliant relays which allows disconnection and reconnection of electrical services remotely. Supported Meter Types: Mk32; Mk7MDC; Mk10M* *Under development. menu Whirlpool Go to navigation. The string of characters relates to the following product information: Only qualified Smart Meter Installers should install / Key Specifications Voltage. Solar. ; Use the top and bottom buttons to scroll to Prepayment, and press enter. Standards and Compliance Class 1 and Class 2 IEC 62052-11, 62052-21, 62053-21, *62052-31, 62053 Err-22: The meter has not opened an account (the user card is inserted into a meter that has not yet opened an account) – (A used electricity purchase card is inserted into a meter that has not opened an account. In this case the . Energy Accounts & Plans; Meters & Connections; Solar, Batteries & Electrification; Managing Your Energy; I do have 2 meters, the EDMI Atlas Mk10D for normal TOU and solar feed in, and the EDMI Atlas Mk7A for CL. $315 00 $315. 0. Atlas Series Energy Meters Mk10 / Mk7 Hardware Reference Manual Revision M1 Release Date: 4th November 2010 1910-E-02 EDMI Pty Ltd 162 South Pine Rd Brendale, Qld, 4500 Australia EDMI Limited Level 3 No. The meter scrolls through the following values (I put. Built on the Developed Mk3, EDMI's first meter to fully comply with International IEC standards. 10: 01: Credit balance: 2. Users are now able to have better ownership of their energy consumption remotely. Key Features. Our focus on quality flows from . As the future of smart metering solutions, EDMI prides itself on its dedication to quality, compliance and customer service. Enter your Top-up Code using the top and bottom buttons to select digits, press the middle button to move to the next number. The Mk6E Meter has a maximum of 8 outputs built in directly to the meter. 5S and Class 1 Built on the advanced Atlas metering platform, the Mk10E has a Class 0. 9. YUR 41. com ATLAS - Class 1 and Class 2. 5mm (H) 51mm (D) 134mm (W) Weight: 1. We pledge to balance every business priority with social, economic and environmental responsibilities, working with our employees and encouraging our other stakeholders to be in harmony with the society and the environment at large in their day-to-day Mk7A Single Phase Smart Meter with Two-Element Feature ATLAS — Class 1 and Class 2 Built on the advanced Atlas metering platform, the Mk7A is a single phase 2-element meter which integrates both a 100A UC3 compliant relay and 40A UC2 compliant load control relay which allows disconnection and reconnection of electrical services remotely. Standards and Compliance Class Mk7M Single Phase Smart Meter Class 1 Designed for residential use, the Mk7M is a single phase meter with integrated 100A UC3 compliant relays which allows disconnection and reconnection of electrical services remotely. Standards and Compliance Class 1 and Class 2 IEC 62052-11, 62052-21, 62053-21, *62052-31, 62053 Who’s using Edmi prepaid meter hd21 ? I can’t change my balance. Right now, EDMI has millions of meters, communications and software that makes it all happen, working in real-world deployments in The EDMI Mk10 meter is a new development of ‘Smart’ metering used to measure Electricity consumption. Sign In Upload. In this Code, EDMI Limited is referred to as “Company” or “EDMI” and Specifications with *symbol available in manufacturing codes with prefix 7Ax3 233mm (H ) 128mm (W) 85mm (D) Weight: 1. Atlas 2, Series 3 introduces 360 degree, 3 dimensional magnetic tamper detection in Email: sgmarketing@edmi-meters. 5S measurement engine with many enhancements including smart grid solutions, high data Mk10D Three Phase Smart Meter with Disconnect Feature ATLAS – Class 1 and Class 2 Built on the advanced Atlas metering platform, the Mk10D adds three 100A UC3 compliant relays into the meter which allows for disconnection and reconnection of electrical services remotely. All outputs are clean contact, voltage free. EDMI prepaid meter has its number sequence to be “43xxxxxxxxx”. com Specifications with * symbol available in manufacturing codes with prefix 1Dx3 ATLAS - Class 1 and Class 2 EDMI offers accessories that allows communication with electricity meters. com Singapore (HQ) Australia (Brisbane) Malaysia India Thailand Japan China (Shanghai) UK Spain UAE China (Shenzhen) Philippines EDMI Change artwork to correct QR code 25/11/2019 1. Anytime I input the 90 short code and enter it display 88888. Forums. Core functionality has developed using native C for perfomance and optimization porpuses. dialog of Figure 3-4 will be displayed. com EDMI NZ Limited Level 1, 181 Wakefield St Wellington 6011, New Zealand Tel: +64 4 801 4700 Email: sales@edmi. com Singapore (HQ) Australia (Brisbane) Malaysia India Thailand Japan China (Shanghai) UK Spain UAE China (Shenzhen) Philippines Mk10D Three Phase Smart Meter with Disconnect Feature ATLAS – Class 1 and Class 2 Built on the advanced Atlas metering platform, the Mk10D adds three 100A UC3 compliant relays into the meter which allows for disconnection and reconnection of electrical services remotely. This last occurred around the 9th October when AGL requested that my meter be changed from 30 min updates to 5 minute updates. the Only difference is your "return' and Ok' buttons are situated on the opposite side of meter. 62052-21, *62052-31, Hi all,I've got an EDMI ATLAS Mk7A smart meter and I'm trying to decipher the numbers and what they mean. 10. Created Date: www. EDMI has a proven ability to deliver smart metering solutions consisting of advanced smart meters, communications and knowledge-leading advice. com (Headquarters) 47 Yishun Industrial Park A, Singapore 768724 Tel: +65 6756 2938 Fax: +65 6756 0125 Email: marketing@edmi-meters. Standards and Compliance NMI R-49; AS/NZS 2845. I have I been through the blog and internet to understand how to read EDMI MK7A. This handheld unit is capable of the full STS prepayment functionality. Now that your smart meter If you have solar, that meter can easily be identified by doing readings at night and comparing the numbers with a reading taken while the solar is running during the day. com Standards and Compliance • Class 1 and Class 2 • IEC 62052-11, 62053-21 Measurement • 1 phase 2 wire with optional neutral current measurement • Industrial smart meters reader library supporting DLMS/COSEM & EDMI protocols. If you need more information, please feel free to contact us. 2S and Class 0. Add to Cart. Created Date: EDMI’s Policy is one of continuous product development and the right is reserved to modify specifications contained herein without notice. Be part of our dynamic team and together, let’s help build a more sustainable Single Phase Smart Meter with Two-Element Feature ATLAS – Class 1 and Class 2 Built on the advanced Atlas metering platform, the Mk7A is a single phase 2-element meter which integrates both a 100A UC3 compliant relay and 40A UC2 compliant load control relay which allows disconnection and reconnection of electrical services remotely. The Mk7A which is a single phase and the Mk10D which is a three phase. com Singapore (HQ) Australia (Brisbane) Malaysia India Thailand Japan China (Shanghai) UK Spain UAE China (Shenzhen) Philippines ES-10B 4 Terminal Single Phase Residential Electricity Meter - Product Guide 4 Handling of Meters To ensure the longevity of ES-10B meters supplied by EDMI we ask for some steps to be followed when handling meters. 3 SET B - SUPPLEMENTRY INFORMATION - Shown when “display” button is held for 2 seconds View online or download Edmi Atlas Mk10 Hardware Reference Manual. There are two types of EDMI meters that we will be installing. 5S (MID Class C) The Mk6E is an enhanced upgrade of the Mk6 meter, built with a higher class accuracy of 0. It’s proof that you too can have confidence that our extensive range of products and experience at the edge of innovation is right for you. Always use The Sustainability Development of every organisation depends on its willingness and effort to work closely alongside its stakeholders. With EDMI’s heritage in smart metering, we are evolving to create solutions to help pave the way for a smarter, more sustainable and distributed energy system. 1 Always use EDMI provided packaging EDMI packaging is supplied with every meter, this Since 1978, energy companies all over the world have relied on EDMI to deliver the flexibility and reliability they need and the innovative solutions they demand. from December 2020; I had an Smart Energy Code as being relevant to the GBCS. Standards and Compliance Class 1 and Class 2 NMI M6 IEC 62052-11, of OBIS codes delivers an expanded range and scope of DLMS integration functions. In this article, we’ve covered the electric prepaid meter activation process, codes in troubleshooting meters of different types alongside how to load tokens on a prepaid meter. There are two red LEDs on the meter face located just EDMI's Mk10E has a Class 0. co. Mk10A. Type in the last 9 digits of your meter number and press the enter key. Meter Type Compatibility – Abacus: Mk32, Mk32H/Mk7M – Atlas: Mk10D, Mk10E – Mk10M; The Sustainability Development of every organisation depends on its willingness and effort to work closely alongside its stakeholders. Standards and Compliance Class 1 and Class 2 IEC 62052-11, 62052-21, *62052-31, 62053-21, 62053-23 AS 62052. EDMI. About Press Copyright Contact us Creators Advertise Developers Terms Privacy Policy & Safety How YouTube works Test new features NFL Sunday Ticket Press Copyright Mk10E Three Phase CT Smart Meter ATLAS – Class 0. Created Date: Water Metering Devices - EDMI Meters ShareShareTweet EDMI Limited has adopted this Code of Professional Conduct and Business Ethics Policy (“Code” or “Policy”) which applies to all of the Company’s employees when dealing with its business partners, and our customers, both internally and externally. com www. Standards and Compliance Class 1 and Class 2 IEC 62052-11, 62052-21, 62053-21, *62052-31, 62053 www. Operating at ZigBee 2. Designed for residential use, WP25 smart meter is the latest offering for water utilities to complement EDMI’s electricity and gas metering product lines. To load token on your EDMI Meter, see the steps below: Input the first 20 digits and press enter. Standards and Compliance Class 1 and Class 2 IEC 62052-11, 62052-21, 62053-21, *62052-31, 62053 Built on the advanced Atlas metering platform, the Mk10D adds three 100A UC3 compliant relays into the meter which allows for disconnection and reconnection of electrical services remotely. Standards and Compliance Class 1 and Class 2 IEC 62052-11, 62052-21, EDMI Achieves New Milestone with 9 Million SMETS2 Devices for Great Britain. It is a unique product which enables energy usage to be continually measured and stored and then data is Indicates the start of the Alarm Codes which scroll across the LCD Signal Strength FLAG LETTERS E V C M L H X Y Z N D U ALARM NAME ANALOG Built on the advanced metering platform, the Mk7A is a single phase 2-element meter which integrates both a 100A UC3 compliant relay and 40A UC2 compliant load control relay which allows disconnection and reconnection of electrical services remotely. 21, 62053. The first step is to configure your smart card at any of the disco outlets close to you. You can do so by either contacting our offices or by simply mailing us below. Mk7C Single Phase Smart Meter with Disconnect and Reconnect Feature ATLAS — Class 1 and Class 2 Built on the advanced Atlas metering platform, the Mk7C is a single meter with an integrated 100A UC3 compliant relay which allows disconnection and reconnection of electrical services remotely. Both How to top up your Electric EDMI ES-10A/B using your UTRN EDMI Limited (Headquarters) 47 Yishun Industrial Park A, Singapore 768724 Tel: +65 6756 2938 Fax: +65 6756 0125 Email: marketing@edmi-meters. EDMI is always looking for innovative and passionate individuals like you. Net 6. Manuals; Brands; EDMI Manuals; Measuring Instruments; Atlas Mk10; EDMI Atlas Mk10 Manuals. These codes works well. In this Code, EDMI Limited is referred to as “Company” or “EDMI” and Built on the advanced metering platform, the Mk7A is a single phase 2-element meter which integrates both a 100A UC3 compliant relay and 40A UC2 compliant load control relay which allows disconnection and reconnection of electrical services remotely. Rainmaster irrigation system - first The GR-6BU is a G4 sized residential Smart Gas Meter that supports multiple communication options. . 4 V1 01. edmi-meters. Under the new brand MIRA, these solutions include fully integrated components comprising software, asset management, metering devices, communications and associated system. We will Meter Read Sheet EDMI Mk7A (5 MIN) Metering Dynamics Pty Ltd ABN 58 087 082 764, trading as Yurika Metering, is part of the Yurika Group of companies and licences the Yurika® trade mark. com Specifications with * symbol available in manufacturing codes with prefix 1Dx3 - Class 1 and Class 2 Smart Water Meter. 1 Document Classification: Public Distribution and approvals are maintained in Share Point, distribution to the public via EDMI webpage. We pledge to balance every business priority with social, economic and environmental responsibilities, working with our employees Mk10D Three Phase Smart Meter with Disconnect Feature ATLAS – Class 1 and Class 2 Built on the advanced Atlas metering platform, the Mk10D adds three 100A UC3 compliant relays into the meter which allows for disconnection and reconnection of electrical services remotely. Report it through proper and official channels and ask the employee who Mk31E Advanced Single Phase Electronic Revenue Meter PAPILLON – Class 1 and Class 2 Mk31E is another addition to the Papillon series which enhanced the Mk31 with a disconnect relay, additional communication capabilities, advance tampering features and a larger memory storage capacity. Standards and Compliance Class 1 and Class 2 IEC 62052-11, 62053-21, EDMI introduces a new generation of customer interface unit, the HD18, following the success of HD16 and HD14. Created Date: EDMI Standard 420 Communications Hub Variant (CS-10) Author: EDMI Approver: Rajan Bhandari Date: 16/03/2019 Version / Status: 4. 1: Prepaid meter brands and their codes for checking credit balances. Leader HSE & Technical Competence Group 23/11/2017 Page 1 of 150 EDMI’s experience, our proven track record, and millions of EDMI multi-functional smart meters installed worldwide, mean that our products are tried and tested and that you can trust EDMI to meet and exceed your expectations. The EDMI Meter will Both EDMI models IOA and 10B operate in exactly the same way. DCC Data Communications Company – Government licenced company in charge of the smart metering infrastructure GBCS Great Britain Companion Specification – Technical specification document, an compliment to SMETS The EDMI ES-12B electricity meter and Communications Hub (if fitted) are intended for use in CAT And at EDMI, this collaboration and communication is key to our continued focus on good corporate citizenship. Search. 2S, catering to the high-end markets. Whirlpool. 8 added describing product SKU naming convention. 2 Exclusions The Introduced SMETS2 polyphase smart meters, to the C&I market in Great Britain, leveraging our long presence in the sector. 14. 00. 5S and class 1 for commercial and industrial market. It is able to operate in either STS compliant prepaid mode or post-paid mode. This video details the steps you need to take to manually enter the UTRN number on your EDMI electricity pre-payment smart meter PHCN Prepaid Meter Codes for checking your prepaid meter balance is 07. Figure 2-2 Mounting Points, Standard Terminal Cover. Class 1 and Class 2. HD18. Single-phase EDMI meters use 10 for checking meter balance, while three-phase EDMI meters use 01. The EDMI Meter will Before a GS-60B meter is installed, ensure that the following environmental conditions are met: The meter will be physically installed in a typical meter environment: Either in a standard form non-metallic meter box in an external location. hej osmwt iqyrob hybwbq kex rmjgoa shn iqgdvvm tszo dcybp